![]() 2875, NERC would be required to submit a report to Congress that: 2875) would require the North American Electric Reliability Corporation (NERC), in consultation with the Department of Energy (DOE), Federal Energy Regulatory Commission (FERC), and the Regional Transmission Organizations (RTOs) and Independent System Operators (ISOs) to submit a report to Congress every two years identifying risks to the long-term reliability of the electric grid and electricity generation. ![]() The Grid Reliability and Resiliency Improvements Act(H.R. “As the federal government drives reliable power generation into retirement, the American people should know the corresponding risks that misguided policies pose to long-term grid reliability.” The Biden Administration’s rush-to-green agenda is pushing the country’s electric grid to the brink,” said Congressman Balderson. “When the American people reach for the light switch, they should have confidence in knowing that the lights will actually turn on. ![]() House of Representatives today that would provide increased transparency and information on the long-term reliability of America’s electrical grid. Congressman Troy Balderson (OH-12) announced the introduction of legislation in the U.S. ![]()
0 Comments
Leave a Reply. |